Sapura Exploration and Production Commences Production at Block SK310 B15 Gas Field

Monday 26 March 2018

Sapura Exploration and Production (Sarawak) Inc., a wholly-owned subsidiary of Sapura Energy Berhad, announced that it has commenced production at the B15 field. The B15 gas field development is a maiden gas development project for Sapura E&P and the first gas milestone was achieved within 2 years of the sanction of its Field Development Plan (“FDP”).

The B15 field was discovered in December 2010 and is located within the SK310 Production Sharing Contract (“PSC”) area, offshore Sarawak, East Malaysia. The development comprises a processing platform with a 35 kilometre evacuation pipeline tied into the existing B11 infrastructure for onwards transmission into the Malaysia Liquefied Natural Gas complex at Bintulu, Sarawak.

Sapura E&P via Sapura Exploration and Production (Sarawak) Inc. is the Operator of the SK310 PSC with a 30% participating interest and partners with PETRONAS Carigali Sdn. Bhd. at 40% and Diamond Energy Sarawak Sdn. Bhd., a subsidiary of Mitsubishi Corporation at 30%.

Related Oil & Gas Projects