HydraWell to Plug in Azerbaijan
Friday 16 February 2018
TOTAL E&P Absheron B.V., acting as operator for and on behalf of a consortium presently composed of Total E&P Absheron B.V. (50%) and Socar Absheron LLC (50%). has tasked HydraWell to execute a part of plug & abandonment campaign at the Absheron field in the Caspian Sea.
To execute the campaign, HydraWell will utilise its HydraHemeraTM Perf, Wash and Cement (PWC®) jetting system, which can install a rock-to-rock barrier in two days. Plugging offshore wells with conventional methods, such as section milling, takes considerably longer time to complete, and drives the associated P&A costs up significantly.
The contract value for HydraWell is undisclosed.