Consent to Use Bideford Dolphin on the Snorre Field

Wednesday 21 June 2017

Statoil Petroleum AS has received consent to use the Bideford Dolphin drilling facility for drilling and completing well 34/7-A-10 on the Snorre field.

Drilling is scheduled to begin on 7 July 2017 and to last 110 days.

Bideford Dolphin is operated by Dolphin Drilling AS. Bideford Dolphin is a mobile drilling facility of the Aker H-3 type, built at Aker Verdal in 1975 and modified in 1998. The facility is classified by DNV GL and registered in Singapore.

Bideford Dolphin was issued with an Acknowledgement of Compliance (AoC) by the PSA in September 2004.

Related Oil & Gas Projects