Mariner Sail Away

Friday 5 May 2017

The first modules for Mariner topside is now on its way to the Mariner oilfield east of Shetland. They left the DSME yard in South Korea 2. May on board the heavy transport vessel Forte. The more than 38 000 tonnes topside consists of 8 modules and a flare – a huge engineering and construction challenge. During the summer the modules will be installed offshore by heavy lift vessel Saipem 7000. Mariner is planned to come on stream 2. Half 2018.

Related Oil & Gas Projects