CNOOC announced that the Enping 15-1/10-2/15-2/20-4 oilfield group joint development project was put into production
Wednesday 7 December 2022
China National Offshore Oil Corporation announced that Enping 15- The 1/10-2/15-2/20-4 oilfield group joint development project was put into production.
The Enping 15-1/10-2/15-2/20-4 oilfield group is located in the eastern part of the South China Sea, with an average water depth of about 90 meters. The main production facilities of the project include 2 drilling and production platforms and 1 unmanned wellhead platform. 48 production wells are planned to be put into production.
The Enping 15-1/10-2/15-2/20-4 oilfield group joint development project has built the first new unmanned platform in the east of the South China Sea and has the function of typhoon remote production. At the same time, the project has built China's first offshore carbon dioxide storage demonstration project, and plans to put into operation a carbon dioxide gas injection well to reinject and store carbon dioxide produced by the oilfield group.
Zhou Xinhuai, CEO of the company, said: "The completion and commissioning of the Enping 15-1/10-2/15-2/20-4 oilfield group joint development project is an important breakthrough for China's offshore oilfields to be unmanned, less-manned, and intelligent. , is also an important achievement of the green and low-carbon transformation of offshore oilfields. In the future, CNOOC will further enhance its independent innovation capabilities, increase oil and gas storage and production, and accelerate the research and development, promotion and application of advanced energy-saving and carbon-reducing technologies, so as to provide the company with high-quality, sustainable Development contributes greater value."