Equinor - consent for extended operation of Mikkel subsea
Friday 11 November 2022
The Petroleum Safety Authority Norway (PSA) has given Equinor Energy AS (Equinor) consent for extended operation of the Mikkel field.
Consent for operation of Mikkel expires on 3 Juli 2023.
The PSA have now given consent for extended operation of the Mikkel field until 31 December 2039.